Our State of the art mill began operations in 2001. The 18,000 sq/mtr facility has a monthly capacitytoproduce 300,000 kilos (aprox 1.2 million yds) of fabric and 600,000 garments. The infrastructure wasdesigned for expansion and blue prints are in place to double the size of the knitting and finishing plants.We are continually upgrading our equipment in order to meet market needs at the highest level of quality. Taking into consideration the environment and ecological regulations, we have a biological waste water treatmentplant. As phase 2 to this project, waste water will be reused in the process for savings in water and energy usage.